Three different road repair compounds were tested at four different highway locations. At each location, three sections of the road were repaired, each section with one of the three compounds. Data were then collected on the number of days of traffic usage before additional repair was required in order to test for a difference between the compounds.

Using α = .05, the appropriate critical value is